| |
|
|
► |
Melbourne Central |
| |
|
| |
 |
| |
|
| |
Works performed - Recalibration of all the primary air
to the VAV boxes on all floors on behalf of Alerton Controls. |
| |
|
|
► |
Casselden Place La Trobe Street Melbourne |
| |
|
| |
 |
| |
|
| |
Works performed - Recalibration of all the primary air
to the VAV boxes on all floors on behalf of Alerton Controls. |
| |
|
|
► |
Philip Morris, Malaysia |
| |
|
| |
Works performed - Surveyed the air conditioning plant at
their manufacturing plant on behalf of Philip Morris |
| |
|
| |
NEXT >> |
|
|
|
ORGANIZATIONAL
ACTIVITIES
|
 |
|
William's activities within the AIRAH organisation have included:
1) AIRAH Victorian Committee 2) Past convenor and active member of the Commissioning & Balancing
S.I.G. 3) Preparing of two Technician Guide's for publication (VAV Systems
& Hydronic systems).
|
 |
|
|
 |
|
|
 |
| |
|
|
|
|